• Dodsland Oil Battery
    Dodsland Oil Battery

    In 2013, Teine Energy underwent an expansion of the Dodsland Oil Battery, adding a 4 tank battery and outbuildings. To join the oil and...

  • CLSC des Faubourgs
    CLSC des Faubourgs

    Needing to install a heating and cooling mitigated glycol system, the contractor opted to use schedule 10S stainless steel pipe for its...

  • Sentinel Copper - Raw Water Pipeline
    Sentinel Copper - Raw Water Pipeline

    The 16.8km (10.5 mile) Sentinel copper water pipeline serves as the main source of raw water for the Sentinel Mine, the flagship of...

Victualic