|
Whether maintenance is planned or unplanned every minute counts. The question then becomes "What can I do to minimize my downtime?"
Victaulic users have reduced their downtime by as much as 50% versus flanged systems. Components are reusable unlike flanges where gaskets must frequently be replaced. And since only 2 bolts and nuts need to be removed on systems 12"/300mm and down your time to access the system is minimized.
The chart at the right illustrates the downtime reductions you can achieve with Victaulic piping products.
|