“We were able to show the engineering team that by using Victaulic grooved products, they would get a consistent roll grooved piping system and Schedule 10 piping could be used instead of cut-grooved Schedule 40 pipe. The move to Schedule 10 led to an approximate 50% savings in pipe materials overall.”