Case Studies

Case Studies

Selected Filters:
    • ZURICH HEADQUARTERS

      In September, construction was completed on Zurich’s new $333M North American Headquarters.The contractor, Shambaugh & Sons, chose to utilize Victaulic VicFlexTM flexible sprinkler fittings over...

      More about this Case Study
    • EMCO Warehouse

      For the new EMCO warehouse, the contractor used a revolutionary new product – Victaulic FireLock™ Installation-Ready™ Fittings - that would improve productivity and efficiency when installing...

      More about this Case Study
    • MINA SAN RAFAEL

      Recently, the Mina San Rafael maintenance and production departments were having trouble with the pinch and knife gate valves on the mine's tailing line. The knife gate valves were leaking often and...

      More about this Case Study
    • Valmon Stampati, Italy

      Being prohibited from operating and welding on premise, Euroidraulica was faced with the challenge of joining process cooling water systems in a timely fashion without the use of hotworks. To...

      More about this Case Study
    • Basix Production Plant, Italy

      Basix, a production plant for plastic material, needed to install a new cooling system based on an adiabatic cooler. The Victaulic grooved pipe joining system was chosen over traditional weld,...

      More about this Case Study
    • IPG Laser R&D Center, Germany

      Tasked with setting up its new R&D Center in Germany on a very tight schedule, IPG evaluated its options and decided Victaulic offered the only pipe joining solution that could be installed in such a...

      More about this Case Study
    • Torre Europa, Madrid, Spain

      Torre Europa is a well-known office building located in the heart of Madrid, close to the famous Santiago Bernabéu Stadium. Its HVAC system was recently renovated to provide better service to the...

      More about this Case Study
    • Singapore National Art Gallery

      The Singapore National Art Gallery features one of the largest public collections of art in Asia. The Gallery is housed inside of two national monuments - the Singapore Supreme Court and City Hall...

      More about this Case Study
    • TRILIUM TOWER

      Trilium Tower is a new 12-floor office building in Lima, Peru. It is located in the San Isidro district of Lima, an area inhabited by mostly upper-class families that is also becoming a major financial quarter.

      More about this Case Study
    • KALLISON RANCH ELEMENTARY SCHOOL

      Kallison Ranch Elementary School is the newest school to join Northside Independent School District. With 119 total schools and a growing population of over 100,000 students.

      More about this Case Study
    • MICROSOFT DATA CENTER

      By choosing Victaulic grooved technology, there was an overall estimated 30% time savings compared to using traditional pipe joining methods at this data center in San Antonio, Texas.

      More about this Case Study
    • MUSEUM OF WESTWARD EXPANSION

      In 2015, the Museum of Westward Expansion, located below the Gateway Arch in St. Louis, underwent construction as part of the $380 million CityArchRiver project to improve the national monument and the surrounding area.

      More about this Case Study