First Energy - W. H. Sammis Power Plant
The construction of the new First Energy – W. H. Sammis Power Plant in Empire, Ohio included the installation of two Babcock & Wilcox wet scrubbers to reduce SO² emissions. After cost comparisons and performance and maintenance tests by the Victaulic sales team, First Energy decided to install the Victaulic Style 220 317LMN alloy scrubber nozzle couplings.
The Victaulic Style 220 nozzle coupling is a single-bolt alloy coupling designed for easier and quicker installation than four-bolt flanged joining systems. In addition to quick and easy installation, Babcock and Wilcox, the technology provider, reduced labor and material costs as well as improved system performance and maintainability with minimal engineering changes.
Search Terms: PS-IND112, PSIND112, PS.IND112
First Energy - W. H. Sammis Power Plant
The construction of the new First Energy – W. H. Sammis Power Plant in Empire, Ohio included the installation of two Babcock & Wilcox wet scrubbers to reduce SO² emissions. After cost comparisons and performance and maintenance tests by the Victaulic sales team, First Energy decided to install the Victaulic Style 220 317LMN alloy scrubber nozzle couplings.
The Victaulic Style 220 nozzle coupling is a single-bolt alloy coupling designed for easier and quicker installation than four-bolt flanged joining systems. In addition to quick and easy installation, Babcock and Wilcox, the technology provider, reduced labor and material costs as well as improved system performance and maintainability with minimal engineering changes.
Search Terms: PS-IND112, PSIND112, PS.IND112