Lincoln University

In January 2005, Lincoln University began experiencing growing delays during the construction of a new student residence building. Needing to make up precious time, the project manager and contractors selected the PermaLynx push-to-connect copper mechanical joining system. The mechanical contractor for the project used PermaLynx fittings, valves, tees, reducers and adapters on the dormitory’s domestic water services because of its ability to accommodate for space constraints and the ease and speed of the system installation. “PermaLynx was the only system that could meet the schedule,” said John Thompson, Director, Officer of the Physical Plant, Lincoln University.