Case Studies
Victaulic can be found in some of the most prestegious buildings globally. Browse through the Victaulic Case Studies to learn about the unique solutions provided by Victaulic technology and services.
Victaulic Case Studies
Data Processing Center Agriculture Bank of China
The Agriculture Bank of China's 81,519 sq. m/871 sq. ft data processing center is located in Waigaoqiao Bonded Zone, Shanghai. This is the largest data processing center in the China bank market. The data processing center features offices, a computer room, an unmanned manufacturing plant, a power facility and a training center. The main computer room utilizes highly complicated technologies and required a high standard piping solution. The Victaulic mechanical piping system was selected for use on the data processing center because it is easy to install and meets the demands of tight construction schedules. Equally as important, Victaulic piping systems are safe and reliable. Three flexible couplings were used to replace the traditional rubber joints and achieved better performance in noise and vibration attenuation. Additionally, the Victaulic mechanical piping system saved significant space in the mechanical room and easily accommodates for maintenance and future expansion.
Search Terms: PS-HVAC.200, PSHVAC200, PS-HVAC-200, PS.HVAC.200
Data Processing Center Agriculture Bank of China
The Agriculture Bank of China's 81,519 sq. m/871 sq. ft data processing center is located in Waigaoqiao Bonded Zone, Shanghai. This is the largest data processing center in the China bank market. The data processing center features offices, a computer room, an unmanned manufacturing plant, a power facility and a training center. The main computer room utilizes highly complicated technologies and required a high standard piping solution. The Victaulic mechanical piping system was selected for use on the data processing center because it is easy to install and meets the demands of tight construction schedules. Equally as important, Victaulic piping systems are safe and reliable. Three flexible couplings were used to replace the traditional rubber joints and achieved better performance in noise and vibration attenuation. Additionally, the Victaulic mechanical piping system saved significant space in the mechanical room and easily accommodates for maintenance and future expansion.
Search Terms: PS-HVAC.200, PSHVAC200, PS-HVAC-200, PS.HVAC.200


