500,000 Sq. Ft. Distribution Warehouse

Project at a glance

View Gallery
Project Type: Distribution Center / Warehouse
Contractor: 360 Fire Prevention
Services:
  • Coordinated Delivery
  • Training
Pipe Material:
  • Carbon Steel
Pipe Size: ¼ - 2” / DN8 – DN50; 2 – 12” / DN50 - DN300
Location: New Jersey, USA
Solutions:
  • Compressed Construction Schedule
  • Cost and Schedule Certainty
  • Design Flexibility
  • Ease of Installation
  • Fire Suppression
  • Improved Safety

A 500,000-square-foot liquor distribution warehouse in New Jersey became the largest and most demanding project in 360 Fire Prevention’s history. Because the facility stores spirits above 20 percent alcohol by volume, the contents are flammable enough to require fire protection inside the storage racks, not just overhead. The contractor designed and installed nine in-rack sprinkler systems across two-thirds of the building, working closely with Victaulic and the rack manufacturer.

A Flammable Commodity and a Tight Timeline

360 Fire Prevention evaluated the warehouse’s existing ESFR sprinkler system against the high-proof spirits heading into the project, knew it would not be adequate. The company led the code analysis in-house and used Victaulic as a technical sounding board, checking its own reading of the applicable NFPA requirements against Victaulic’s until both arrived at the same design criteria. That design was unusually dense, with four sprinklers surrounding every pallet and each rack run split into three sections by the forklift drive aisles. Not only was the massive scale an obstacle with the project consisting of more than 21,000 in-rack heads and 3,000 overhead sprinklers, but time was an even bigger one because the customer wanted it done in less than 12 weeks, nearly half of what a project of this size would normally take.

An Installation-Ready Solution

To hit that schedule, 360 Fire Prevention went fully Victaulic on the in-rack scope, building it on the FireLock™ IGS™ Installation-Ready™ grooved system. Because the fittings assemble with an impact gun instead of threaded joints, crews worked far faster in the tight, elevated spaces between racks. “It was very easy to land on the IGS couplings so we didn’t have to deal with threading fittings and tight spaces,” said CJ Musumeci, owner of 360 Fire Prevention. “It was kind of a no-brainer.” The team prefabricated as much as possible on the ground, running four RG2910 Roll Grooving Tools in assembly lines and feeding preassembled lengths of IGS couplings, elbows and the Style V9 FireLock™ IGS™ Installation-Ready™ Sprinkler Coupling through each rack as it was built. 360 Fire Prevention also coordinated with the rack manufacturer on the exact placement of holes cut through the rack steel, so each run of pipe fed straight through and dropped into position on site.

The heavy prefabrication was deliberate, a way to make the install itself go as fast as possible. “I wanted to limit the number of touches and make us as efficient as possible,” Musumeci said. “The second a rack was finished, I wanted to be right there with a piece of pipe ready to put it in.” Ordering the FireLock™ Series FL-QR/ST/INT upright sprinklers with their guards and shields already attached cut the handling further, and the shields protect the heads from the daily knocks of warehouse work. Victaulic trained every technician on the Style V9 coupling and the groover before work began.

Finished in 10 Weeks

All that preparation showed when 360 Fire Prevention finished in 10 weeks, 2 weeks ahead of the deadline given by the customer and right in line with their expectations. “Victaulic was involved from the design throughout the execution, and they made sure I had everything I needed when I needed it,” Musumeci said. The finished system delivered the dense in-rack protection the spirits warehouse required. “Everybody [at 360] takes a lot of pride in what we do,” Musumeci said, very proud of his team’s execution. “It’s not just about getting it done on time.” He stressed the timeline was one thing, but even more important was the quality finished product they delivered to their client.