Skip to content
  • Language
    • English
    • Deutsch
    • Français
    • Español
    • 简体中文
Menu Close
A global leading producer of mechanical pipe joining, flow control, and fire protection solutions.
  • Products
          • Product Guide
          • System Solutions
          • Where To Buy
          • Pipe Joining
          • Rigid
          • Flexible
          • Transition
          • Reducing
          • Outlet
          • Plain End
          • Flange Adapters
          • Expansion Joints
          • Press
          • Tools
          • Roll Groove
          • Cut Groove
          • Press Tools
          • Hole Cut
          • Pipe Cut Off
          • Accessories
          • Fittings
          • Grooved
          • Dielectric Adapters
          • Shouldered
          • Plain End
          • Outlets
          • Mechanical-T
          • Press
          • Equipment Modules
          • Pump Drops
          • Headers
          • PRV Stations
          • Riser Fittings
          • Isolation Outlet Fittings
          • Flow Control
          • Ball
          • Butterfly
          • Check
          • Plug
          • Diverter
          • Strainer
          • Suction Diffusers
          • Gate
          • Shouldered
          • Hydraulic Control
          • Press
          • Air Valves
          • Hydronic Balancing
          • Koil-Kit™ Coil Packs
          • Manual Balancing Valves
          • Automatic Flow Limiting Valves
          • Differential Pressure Controller
          • Control Valves
          • Domestic Hot Water Balancing Valves
          • Domestic Hot Water Recirculation Kits
          • AHU Drops
          • Accessories
          • Pressure Independent Control Valves
  • Fire
          • Product Guide
          • System Solutions
          • Where To Buy
          • Sprinklers (Click to Filter)
          • Standard Coverage
          • Extended Coverage
          • Residential
          • Storage
          • Dry
          • Specific Application
          • Interactive Sprinkler Chart
          • Pipe Joining
          • Rigid
          • Flexible
          • Reducing
          • Outlet
          • Flange Adapters
          • Press
          • Fittings
          • Grooved
          • Flexible Sprinkler Drops
          • Outlets
          • Mechanical-T
          • Press
          • Tools
          • Roll Groove
          • Cut Groove
          • Press Tools
          • Hole Cut
          • Accessories
          • Devices
          • Preaction
          • Dry
          • Deluge
          • Accessories
          • Wet
          • Special Hazards
          • Victaulic Vortex
          • Flow Control
          • Zone Control
          • Test & Drain
          • Ball
          • Butterfly
          • Check Valve
          • Strainers
          • Actuators
          • Alternate Wet/Dry
          • Gate
          • Hydraulic Control
          • Press
          • Level Control
          • Wall Post
  • Markets
          • Commercial & Residential
          • Mission Critical
          • Education
          • Healthcare
          • Industrial
          • Energy
          • Infrastructure
          • Mining
          • Oil & Gas
          • Projects
          • Commercial/ Residential
          • Education
          • Energy
          • Healthcare
          • Industrial
          • Infrastructure
          • Mining
          • Mission Critical
          • Oil & Gas
  • Solutions
          • Systems
          • System Solution for HDPE Pipe
          • System Solution for PVC/CPVC Pipe
          • VicFlex™ Sprinkler Fitting System
          • Dry Sprinkler System Solutions
          • QuickVic™ SD Installation-Ready™ System
          • See all
        • Engineering Benefits

          • Accommodating Seismic Movement
          • Accommodating Thermal Movement
          • Noise & Vibration Attenuation
        • Mechanical Joining

          • Gasket Technology
          • Grooved Technology
        • System Installation

          • Safer System Installations
          • Compressed Construction Schedules
          • Simplified Maintenance
          • Confined Space Installations
  • Services
          • Application Engineering
          • Custom Castings
        • Customer Training

          • Victaulic University
          • Fire Protection Customer Training
          • Australia Fire Protection Workshop Registration
          • Virtual Design & Construction
          • Software & Content Library
          • Victaulic Tools for Revit
  • Resources
          • Projects
          • Blog
          • Software & Content Library
          • Tools & Calculators
          • Industry Resources
          • Order Literature
          • Supplier Resources
          • Trade Compliance
          • SmartVic (EMEAI & AP only)
          • Literature
          • Certifications & Approvals
          • Submittals
          • Manuals
          • Technical & Design Data
          • Technical Notifications
          • White Papers
          • Market Brochures
          • Safety Data Sheets (SDS)
          • Terms & Conditions
          • Technical Service Bulletins
          • Fire Protection Technical Service Bulletins
          • Order Forms & Check Sheets
          • Price Lists
          • United States
          • Africa
          • Australia/New Zealand
          • Canada
          • China
          • Europe/Ireland
          • India
          • Israel
          • Korea
          • Latin America
          • Malaysia
          • Middle East
          • Nordic
          • Southeast Asia
          • United Kingdom
          • Product Specifications
          • Product Selection Guides
          • VicFlex™ Flexible Sprinkler Fitting Systems
  • Company
        • Corporate Headquarters

          4901 Kesslersville Road
          Easton, PA 18040

          • 610-559-3300
          • Get Directions
          • View All Locations
          • About Us
          • Press Releases
          • 100 Years of Innovation
          • Sustainability
          • Careers
          • Code of Conduct
          • Awareness Line
          • Compliance Policies
  • Contact Us
        • Corporate Headquarters

          4901 Kesslersville Road
          Easton, PA 18040

          • 610-559-3300
          • Get Directions
        • Support

          • General Questions
          • Technical Questions
          • Software Content Support
          • Website Feedback
          • Australia Sales Locator
          • DACH Sales Locator
          • France Sales Locator
          • India Sales Locator
          • Italy Sales Locator
          • New Zealand Sales Locator
          • Nordic Sales Locator
          • North Asia Sales Locator
          • Southeast Asia Sales Locator
          • Spain Sales Locator
          • Find A Location Overview
          • North and South America
          • Canada
          • Mexico
          • Brazil
          • Europe
          • Middle East
          • India
          • Asia Pacific
          • Careers
          • Code of Conduct
          • Awareness Line
          • Compliance Policies
  • Where To Buy
Add Resources to Package
Click to open search
Close
  • Products
    • Pipe Joining
    • Fittings
    • Flow Control
    • Equipment Modules
    • Tools
    • Hydronic Balancing
    • Product Guide
    • Systems
    • Where to Buy
  • Fire
    • Sprinklers (Click to filter)
    • Interactive Sprinkler Chart
    • Pipe Joining
    • Fittings
    • Flow Control
    • Devices
    • Special Hazards
    • Tools
    • Product Guide
  • Markets
    • Commercial & Residential
    • Mission Critical
    • Education
    • Healthcare
    • Industrial
    • Energy
    • Infrastructure
    • Mining
    • Oil, Gas, & Chemical
  • Solutions
    • Engineering Benefits
      • Accommodating Seismic Movement
      • Accommodating Thermal Movement
      • Noise & Vibration Attenuation
    • Mechanical Joining
      • Gasket Technology
      • Grooved Technology
    • System Installation
      • Safer System Installations
      • Compressed Construction Schedules
      • Simplified Maintenance
      • Confined Space Installations
  • Systems
    • VicFlex™ Sprinkler Fitting System
    • Dry Sprinkler System Solutions
    • QuickVic™ SD Installation-Ready™ System
  • Services
    • Applications Engineering
    • Custom Castings
    • Customer Training
      • Customer Training Overview
      • Victaulic University
      • Fire Protection Workshop Registration
  • Virtual Design & Construction
    • Software Library
    • Victaulic Tools for Revit
  • Resources
    • Blog
    • Literature
    • Projects
    • Price Lists
    • Tools & Calculators
  • Company
    • About Us
    • Careers
  • Contact Us
    • Contact Us Overview
    • Technical Questions
    • Software Content Support
    • Find a Location
    • Website Feedback
    • Careers
  • Where to Buy
  • Language
    • English
    • Deutsch
    • Français
    • Español
    • 简体中文

Topics

Codes & StandardsWater/WastewaterTechnical ExcellenceRenewablesPiping Movement Design (PMD)Oil & GasNewsJobsite SafetyInfrastructureEnergyDynamic MovementConstructabilityProject PartnershipsInsightsHVAC/PlumbingLife at VictaulicFire ProtectionSustainabilityMiningVirtual Design and Construction (VDC)ReliabilityHeritageQualityLongevity
Macheng Iron Mine Project

Macheng Iron Mine Project

Warwick Hospital Project

Warwick Hospital Project

Oyu Tolgoi (OT) Mine Project

Oyu Tolgoi (OT) Mine Project

Clara Maass Medical Center Project

Clara Maass Medical Center Project

Microsoft Taiwan Data Center Project

Microsoft Taiwan Data Center Project

Manchester Plot 9A First Street Office Complex Project

Manchester Plot 9A First Street Office Complex Project

The National Medal of Honor Museum Project

The National Medal of Honor Museum Project

Boston Logan International Airport – Terminal E Project

Boston Logan International Airport – Terminal E Project

43,000 Square-Foot Northern California Data Center Project

43,000 Square-Foot Northern California Data Center Project

Posts navigation

  • 1
  • 2
  • 3
  • …
  • 9
A global leading producer of mechanical pipe joining, flow control, and fire protection solutions.
  • Contact Us
  • Careers
  • Website Feedback
  • Privacy Statement
  • Terms & Conditions
  • Cookie Notice
  • Do Not Sell/Share My Personal Information
  • X
  • Facebook
  • YouTube
  • LinkedIn
  • Instagram
  • WeChat
    WeChat QR Code
© 2026 Victaulic Company. All rights reserved.