Installation-Ready™ Technology Simplifies Arena’s Domestic Water System Retrofit

The Spectrum Center in North Carolina, USA remained operational during water system retrofit using Victaulic products

Installation-Ready™ Technology Simplifies Arena’s Domestic Water System Retrofit

Posted on February 22, 2021

Faced with upgrading its outdated domestic water piping system amid a busy event schedule, the Spectrum Center in Charlotte, North Carolina, relied on Victaulic’s grooved solutions to complete this retrofit on an extremely tight schedule.

The project engineer, AME Consulting Engineers, and the contractor, Precision Plumbing, recognized the need for pipe joining products that could be installed without hot works or excessive noise while still allowing the arena to turn the system on and off as necessary. Victaulic’s Installation-Ready™ products provided that flexibility.

Read more about this efficient, time-saving installation in the November 2020 issue of PM Engineer or the February 2021 issue of Engineered Systems.

Victaulic

Victaulic is the leading producer of mechanical pipe joining solutions. Engineered with confidence, our solutions put people to work faster, while increasing safety, ensuring reliability and maximizing efficiency.

Related posts

Victaulic Advanced Groove System (AGS) Products - helping customers meet construction project deadline

Project Collaboration Helps Build Mental Health Facility

Learn how effective project collaboration with Victaulic helped Indiana’s newest mental health facility construction project finish on time.

Austin Aerial Skyline- Victaulic Cooling Tower Project

HDPE Solutions Simplify Cooling Replacement for Local Contractor

Victaulic HDPE solutions helped Shoemaker Mechanical with cooling tower replacement in less time than traditional joining methods.

Union Station VDC image – Victaulic 3D laser scan with 3D pipe modelingScan Camera Piping

Scan to BIM Expedites 100-Year-Old Retrofit Project

Learn how Victaulic’s scan to BIM process expedited construction on a 100-year-old train station.

Recent posts

Keeping the ECMWF Data Centre Cooled & Weather Forecasts Running

Keeping the ECMWF Data Centre Cooled & Weather Forecasts Running

Learn more on how Victaulic pipe joining solutions helped in keeping the ECMWF data centre in Bologna, Italy cool.

Electrical Power Plant representative of Victaulic's support for the power infrastructure market

Connect with Victaulic at PowerGen 2022

Victaulic is proud to support and participate in the advancement of the power industry. Connect with Victaulic Infrastructure at PowerGen!

Victaulic Helps Thermo Fisher Scale Operations for COVID-19 Sample Processing in Record Time

Victaulic Helps Thermo Fisher Scale Operations for COVID-19 Sample Processing in Record Time

Though no easy feat, Victaulic solutions helped Rand Construction expand Thermo Fisher's capacity for Covid-19 sample processing in 8 weeks.