Effective Project Collaboration Helps Build Mental Health Facility On Time

Victaulic Advanced Groove System (AGS) Products - helping customers meet construction project deadline

Effective Project Collaboration Helps Build Mental Health Facility On Time

Posted on June 29, 2020

New construction projects can experience a variety of challenges, but with creativity, communication, engineering expertise, and reliable products, these complex jobs can be completed.

A perfect example of such effective project collaboration is the new NeuroDiagnostic Institute (NDI) in Indianapolis, Indiana. Construction began in 2016, with an ambitious completion date only two years later. With the help of Victaulic’s Virtual Design and Construction (VDC) team and its Advanced Groove System (AGS) large diameter products, the project met its aggressive deadline.

“With the condensed schedule, it was even more imperative that we were able to use Victaulic solutions,” says Chris Gatewood, vice president of Commercial Air, the project’s mechanical contractor. “I think it saved the project.”

This project was recently highlighted in two popular industry publications, Engineered Systems, and  Plumbing Engineer. Click through to read the full case study.

Victaulic

Victaulic is the leading producer of mechanical pipe joining solutions. Engineered with confidence, our solutions put people to work faster, while increasing safety, ensuring reliability and maximizing efficiency.

Related posts

Mechanical Joint Makes for Fast and Easy CPVC Pipe Repair

A mechanical system’s integrity is critical. An innovative joining system helps to ensure fast, reliable CPVC pipe installation and repair.

Reason One Not to Use Flanged Pipe Joints: Tight Construction Schedule

Read our two-part blog series as we explore the reasons you should avoid using flanged pipe joints on your next commercial construction project.

The Top Five Benefits of Grooved Pipe Joints

Grooved mechanical systems are the most reliable solutions available. Check out our blog to review the top five benefits of grooved systems.

Recent posts

HDPE Solutions Simplify Cooling Tower Replacement for Local Contractor

Victaulic HDPE solutions helped Shoemaker Mechanical replace a rooftop cooling tower in less time than traditional joining methods.

Burns & McDonnell Visits Victaulic

Collaboration efforts between Victaulic and Burns & McDonnell strengthened over a day of hands on learning and demonstrations.

Experts Identified Victaulic Solutions As a Best Practice Benefit for Lined & Coated Pipeline Projects

Victaulic provides efficient and safe ways to manage lined and coated pipeline projects throughout the world.