Innovative Software Enables Successful Install of ASHRAE HQ Mechanical Room

ASHRAE Mechanical Room

Innovative Software Enables Successful Install of ASHRAE HQ Mechanical Room

Posted on April 22, 2021

Faced with high expectations and a short project timeline, Victaulic worked with Shumate Mechanical to design, fabricate and install the basement-level mechanical room for the American Society of Heating, Refrigerating, and Air-Conditioning Engineers (ASHRAE) new state-of-the-art headquarters in Peachtree Corners, Georgia.

Victaulic’s Virtual Design and Construction (VDC) team used its proprietary software add-in, Victaulic Tools for Revit®, to design the building’s three-loop distribution piping system in less than three weeks. And despite the challenges of working through the COVID-19 pandemic, Shumate installed the system in the ASHRAE mechanical room in less than four weeks. Learn more about how the partnership between Victaulic and Shumate contributed to the successful renovation of an existing building to a high-performance, net-zero energy facility in ASHRAE’S commemorative issue.

  • Victaulic Automatic Koil-Kit™ Pack installation at ASHRAE facility

Victaulic

Victaulic is the leading producer of mechanical pipe joining solutions. Engineered with confidence, our solutions put people to work faster, while increasing safety, ensuring reliability and maximizing efficiency.

Related posts

Nebraska community center chooses Victaulic mechanical couplings as its HDPE joining method for the Geothermal HVAC System project

HDPE Joins Geothermal HVAC System for a Community’s Passion Project

Nebraska community center celebrates timely opening after choosing a mechanical solution as its HDPE joining method on the project.

Picture representing how noise and vibration control for HVAC systems is achieved with grooved pipe joining technology

Can pipe couplings provide noise and vibration control for HVAC systems?

Yes. Noise and vibration control for HVAC systems is achieved with grooved pipe joining technology. Allow us to explain.

Verbiage written on chalk board "Best Practices"

The Top Six Mechanical Retrofitting Best Practices – Tip Six

Interested in mechanical retrofitting best practices? Learn about the top six here here. Tip 6: Mechanical Noise and Vibration Control Methods.

Recent posts

ASHRAE Mechanical Room

Innovative Software Enables Successful Install of ASHRAE HQ Mechanical Room

A tight timeline & effects of a pandemic were no match for Victaulic & Shumate Mechanical, who partnered to install the ASHRAE headquarters mechani...

Bolden Mineral Project

Optimizing Mine Backfill with Innovative Diverter Valve Technology

Victaulic has a proven history of optimizing mine backfill system around the world. Here is a look into our innovative diverter valve technology in...

The Spectrum Center in North Carolina, USA remained operational during water system retrofit using Victaulic products

Installation-Ready™ Technology Simplifiesy Arena’s Domestic Water System Retrofit

The Spectrum Center remained operational during its domestic water system retrofit with help from Victaulic grooved solutions.