Victaulic VDC Turns In NYC’s Latest Luxury Building On Budget & On Time

This HVAC installation at 525 West 52nd Street in New York City was on budget and ahead of schedule

Victaulic VDC Turns In NYC’s Latest Luxury Building On Budget & On Time

Posted on March 15, 2018

A smaller-than-normal mechanical room, even by New York City standards, may have presented most contractors with a problem. Fortunately, Martin Associates and project manager Anthony Cicchetti took advantage of Victaulic’s Virtual Design and Construction (VDC) team (formerly known as Construction Piping Services – CPS), and as a result, the HVAC system at 525 West 52nd Street, a new luxury rental residence in NYC’s Hell’s Kitchen neighborhood, was successfully installed, tested and complete in less than two weeks – on budget and ahead of schedule.

Click here to read about this project in the latest issue of MCAA’s Smart Solutions, and learn more about how your next construction job can benefit from teaming up with Victaulic’s VDC department.

Rental residence mechanical room build featuring Victaulic couplings, fittings, pump drops, and more.

Victaulic

Victaulic is the leading producer of mechanical pipe joining solutions. Engineered with confidence, our solutions put people to work faster, while increasing safety, ensuring reliability and maximizing efficiency.

Related posts

Victaulic piping system design in Revit

Grooved Pipe Joining System Design Insight From Revit Expert Ralph Schoch

Interview with Victaulic’s own Ralph Schoch on how using Revit can change the way engineers design grooved piping systems & improve their projects.

Building Better with BIM & Victaulic Prefabrication Piping Services Team

Building Better with BIM & Victaulic Prefabrication Piping Services Team

Jeff Leighton, Victaulic CPS BIM Manager, shares insights on how BIM Coordination & prefabrication piping systems can drive job site productivity a...

Victaulic Style 177N QuickVic™ Installation-Ready™ grooved coupling - pipe joining advancement

Edison Awards Honor Victaulic Pipe-Joining Advancement

Victaulic has been recognized for their pipe joining advancement. Selected as the 2015 Edison Awards Industrial Design bronze award winner for the ...

Recent posts

ASHRAE Mechanical Room

Innovative Software Enables Successful Install of ASHRAE HQ Mechanical Room

A tight timeline & effects of a pandemic were no match for Victaulic & Shumate Mechanical, who partnered to install the ASHRAE headquarters mechani...

Bolden Mineral Project

Optimizing Mine Backfill with Innovative Diverter Valve Technology

Victaulic has a proven history of optimizing mine backfill system around the world. Here is a look into our innovative diverter valve technology in...

The Spectrum Center in North Carolina, USA remained operational during water system retrofit using Victaulic products

Installation-Ready™ Technology Simplifiesy Arena’s Domestic Water System Retrofit

The Spectrum Center remained operational during its domestic water system retrofit with help from Victaulic grooved solutions.