VICTAULIC BLOG

Buried Services Brochure

Commercial Buildings Market Brochure

Victaulic Introduces Style W257 Joint as a More Efficient Solution to Accommodate Dynamic Movement in Water Piping Systems

Cutting for Coal:  The Long and Short of Longwall Mining

Cutting for Coal: The Long and Short of Longwall Mining

Longwall mining is a highly mechanized underground mining method to extract coal where surface mining is not a viable option.

Style W257 Dynamic Movement Joint Submittal

Style W257 Dynamic Movement Joint

Style W257 Dynamic Movement Joint

Style W257. M11 Compliant assembly built to accommodate up to 4’’I 102mm of dynamic movement including differential settlement, seismic and thermal...

How to Design Piping Systems to be Mission Critical-Ready

How to Design Piping Systems to be Mission Critical-Ready

Three (3) pillars that engineers can use to ensure a data center piping system design is mission critical ready from Victaulic.

Victaulic Releases Revit 2018 Toolbar Update to Enhance Pipe Routing and Fabrication Features

Style 005H FireLock™ Rigid Coupling

FireLock™ Style 005H Rigid Coupling

Style 005H. Angled bolt pad provides rigidity. Sizes from 1¼ - 8" | DN32 - DN200. Pressures up to 350 psi | 2413 kPa | 24 bar