VICTAULIC BLOG

Microsoft Taiwan Data Center Project

Microsoft Taiwan Data Center Project

North Asia

The Microsoft Taiwan Data Center Project is building its first cloud-computing data center, while utilizing Victaulic Solutions.

Style 341 Flange Adapter

Style 341 Flange Adapter

Style 341. Designed for direct connection of flanged components into a grooved cast or ductile system. Designed for Class 53 or higher pipe. Sizes ...

Victaulic Announces Sales Leadership Transition

How Manufacturer Involvement Can Mitigate Labor Risks

How Manufacturer Involvement Can Mitigate Labor Risks

While the construction industry grapples with attracting and developing talent, clever product design and manufacturer-led training can go a long w...

The Crux of the Construction Challenge? Productivity, Sustainability, and Change

The Crux of the Construction Challenge? Productivity, Sustainability, and Change

There are quicker, better, and more efficient ways that Victaulic does things that can be adopted now to maintain construction growth.

Fire Protection Customer Training

Fire Protection Customer Training Victaulic Continuing Education – For Professionals, By Professionals Victaulic University Continuing Education provides comprehensive training

Canada Mining Landing Page

Canada Mining Solutions With over a century of proven success on a diverse range of precious metals and minerals,

Canada Mining

CG336 Portable Cut Grooving Tool

CG336 Portable Cut Grooving Tool

• Modular field fabrication cut grooving tool• Designed to simultaneously square cut and groove ductile iron pipe ends