4901 Kesslersville Road Easton, PA 18040
Partnering with Victaulic enabled the Pilbara Minerals Pilgangoora Lithium-Tantalum Project to reduce risk, maximize productivity & enhance onsite ...
The Oaky Creek Coal Mine Raw Water Pipeline Project used Victaulic’s HDPE solution for it’s reliability, durability & flexibility in its components.
The Osisko Malartic Gold Mine Project used Victaulic large diameter pipe joining solutions due to their proven reliability, strength & ease of inst...
The Gold One Water Transport Project relied on Victaulic solutions that accommodate system deflection & provide ease of material handling.
Tunnel Under Vistula River Project, 1300 meter long tunnel which utilized Victaulic transportation infrastructure solutions for safer & faster comp...
The use of Victaulic power infrastructure solutions on the Medupi Power Station Project provided the contractor team with safety and labor & time s...
The Contracting & Engineering team selected Victaulic transmission infrastructure solutions for the retrofit of the Kirkland Methil Pipe Bridge pro...