4901 Kesslersville Road Easton, PA 18040
Tunnel Under Vistula River Project, 1300 meter long tunnel which utilized Victaulic transportation infrastructure solutions for safer & faster comp...
The use of Victaulic power infrastructure solutions on the Medupi Power Station Project provided the contractor team with safety and labor & time s...
The Contracting & Engineering team selected Victaulic transmission infrastructure solutions for the retrofit of the Kirkland Methil Pipe Bridge pro...
Park Creek Sewage Treatment plant ductile iron piping project used Victaulic wastewater infrastructure solutions for ease of install, flexibility &...
Victaulic power infrastructure solutions were used on water lines in the Belchatow Coal-Fired Power Plant project to reduce risk & improve sustaina...
The Avrasya Metro Tunnel Project used victaulic infrastructure modular construction solutions to accommodate for the pipe curvature & thermal movement
Victaulic water infrastructure solutions for thermoplastic coated pipes were used on the Sweden Drinking Water Pipelines project in Stockholm.