4901 Kesslersville Road Easton, PA 18040
The Avrasya Metro Tunnel Project used victaulic infrastructure modular construction solutions to accommodate for the pipe curvature & thermal movement
Victaulic water infrastructure solutions for thermoplastic coated pipes were used on the Sweden Drinking Water Pipelines project in Stockholm.
The Fraser Alexander Mine Dump System Project used Victaulic high pressure shouldered couplings specially designed for mine dump & waste solutions.
Victaulic's infrastructure water system technology solutions were used on the SSWA Perth 2 desalination reverse osmosis system project.
Victaulic infrastructure solutions were chosen to complete the bridge drainage piping & fire suppression system that accommodate for bridge movement.
Achieving mining sustainability goals begins with the products selected for each system within a mine. Victaulic solutions provide a positive impact.
Victaulic showcases large diameter & differential settlement grooved system solutions during a hands-on experience with a civil engineering firm.