VICTAULIC BLOG

Oaky Creek Raw Water Pipeline

Oaky Creek Raw Water Pipeline

Tieri, Queensland, Australia

The Oaky Creek Coal Mine Raw Water Pipeline Project used Victaulic’s HDPE solution for it’s reliability, durability & flexibility in its components.

Osisko Malartic Mine

Osisko Malartic Mine

Malartic, Quebec, Canada

The Osisko Malartic Gold Mine Project used Victaulic large diameter pipe joining solutions due to their proven reliability, strength & ease of inst...

Gold One – Plant Optimization Project

Gold One – Plant Optimization Project

Randfonein, South Africa

The Gold One Water Transport Project relied on Victaulic solutions that accommodate system deflection & provide ease of material handling.

RG1210 OGS-200 Roll Grooving Tool Repair Parts Manual

Tunnel Under Vistula River

Tunnel Under Vistula River

Warsaw, Poland

Tunnel Under Vistula River Project, 1300 meter long tunnel which utilized Victaulic transportation infrastructure solutions for safer & faster comp...

Victaulic® Acquires Waupaca Foundry’s Lawrenceville, PA Manufacturing Facility

Medupi Power Station

Medupi Power Station

Limpopo, South Africa

The use of Victaulic power infrastructure solutions on the Medupi Power Station Project provided the contractor team with safety and labor & time s...

Kirkland Methil Bridge

Kirkland Methil Bridge

Methil, Scotland

The Contracting & Engineering team selected Victaulic transmission infrastructure solutions for the retrofit of the Kirkland Methil Pipe Bridge pro...

Park Creek Sewage Treatment Plant

Park Creek Sewage Treatment Plant

Horsham, PA, USA

Park Creek Sewage Treatment plant ductile iron piping project used Victaulic wastewater infrastructure solutions for ease of install, flexibility &...