The Oaky Creek Coal Mine Raw Water Pipeline Project used Victaulic’s HDPE solution for it’s reliability, durability & flexibility in its components.
The Osisko Malartic Gold Mine Project used Victaulic large diameter pipe joining solutions due to their proven reliability, strength & ease of inst...
The Gold One Water Transport Project relied on Victaulic solutions that accommodate system deflection & provide ease of material handling.
Tunnel Under Vistula River Project, 1300 meter long tunnel which utilized Victaulic transportation infrastructure solutions for safer & faster comp...
The use of Victaulic power infrastructure solutions on the Medupi Power Station Project provided the contractor team with safety and labor & time s...
The Contracting & Engineering team selected Victaulic transmission infrastructure solutions for the retrofit of the Kirkland Methil Pipe Bridge pro...
Park Creek Sewage Treatment plant ductile iron piping project used Victaulic wastewater infrastructure solutions for ease of install, flexibility &...