VICTAULIC BLOG

Standardizing Pipe Fabrication: 3 Design Methods to Cut Construction Costs and Improve Efficiency

Standardizing Pipe Fabrication: 3 Design Methods to Cut Construction Costs and Improve Efficiency

Explore pipe fabrication and how in-house shops enhance efficiency and resource management in construction projects.

Fire Service Campaign Page

FIRE PROTECTION SERVICE SOLUTIONS THAT WORK AS HARD AS YOU DO Two of the primary challenges service contractors face

FP Service

Vision 2 Success

Achieve your strategic advantage with innovative construction solutions Your browser does not support the video tag. At Victaulic, we

Ductile Iron Pipe Modularization

The best-in-class Installation-Ready™ rigid coupling has arrived: Style 009V Firelock™ Installation-Ready™ rigid coupling.

Mining Necessities: How Victaulic’s Paste Backfill Solutions Optimize Underground Operations

Mining Necessities: How Victaulic’s Paste Backfill Solutions Optimize Underground Operations

Victaulic's paste backfill solutions keep mining systems flowing, extending their service life while enhancing safety for the entire operation.

Warwick Hospital Project

Warwick Hospital Project

Warwickshire, UK

Victaulic pipe solutions helped Warwick Hospital cut installation time by 80% in a £14M energy overhaul, boosting safety and sustainability.

Oyu Tolgoi (OT) Mine Project

Oyu Tolgoi (OT) Mine Project

South Gobi, Mongolia

The Oyu Tolgoi (OT) mine project placed an emphasis on reliability and quality of the process piping systems by utilizing Victaulic solutions.

Clara Maass Medical Center Project

Clara Maass Medical Center Project

Belleville, New Jersey, USA

The Clara Maass Medical Center project utilized Victaulic Solutions to upgrade the fire protection system throughout its medical center.