TOPIC: Insights

Vibration Attenuation Characteristics of Victaulic Couplings

Vibration Attenuation Characteristics of Victaulic Couplings

We spotlight an article in the March-April 2016 issue of Southeast Asia Building Magazine written by Victaulic Senior Engineer Dave Hudson.

Reduce Installation Time, Increase Productivity & Jobsite Safety

Reduce Installation Time, Increase Productivity & Jobsite Safety

Victaulic’s FireLock Installation-Ready Couplings revolutionize the planning & implementation of fire protection systems.

How to Fix Rising Steam Repair Costs in Hospitals & Universities

How to Fix Rising Steam Repair Costs in Hospitals & Universities

Victaulic offers tips on how to reduce steam pipe repair costs commonly dealt with by many hospitals & universities with steam systems.

FireLock™ Installation-Ready™ Fittings: Behind the Innovation

FireLock™ Installation-Ready™ Fittings: Behind the Innovation

Q&A with director of couplings & fire suppression systems, Susan Schierwagen on FireLock™ Installation-Ready™ Fitting innovation.

Victaulic Introduces FireLock™ Installation-Ready™ Fittings

Victaulic Introduces FireLock™ Installation-Ready™ Fittings

Introducing new FireLockTM Installation-Ready™ Fittings designed for fire protection systems. Offering a fast, simple installation & a safe jobsite.

Startup Revit Standards Foundation

Startup Revit Standards Foundation

Victaulic explores the establishment of the Revit Standards Foundation, which guards & secures the intellectual property of the NLRS.

Victaulic Introduces FireLock® NXT Series 768N Dry Valve

Victaulic Introduces FireLock® NXT Series 768N Dry Valve

Victaulic introduces the new FireLock® NXT Series 768N Dry Valve. Re-engineered for customer’s needs. Now provides simplified set-up & maintenance.

World’s 1st Grooved Mechanical Piping System for Saturated Steam Launched

World’s 1st Grooved Mechanical Piping System for Saturated Steam Launched

Victaulic has developed the first mechanical grooved piping system for saturated steam & condensate piping, eliminating the need to weld steam piping.

NASA Puts Victaulic Couplings to the Test at Launch Pad & Vibration Lab

NASA Puts Victaulic Couplings to the Test at Launch Pad & Vibration Lab

NASA tests how Victaulic flexible couplings handle piping systems vibration. Post includes results such as dampening & reduction capabilities stats.