4901 Kesslersville Road Easton, PA 18040
Engineered pipe clamp anchor can be connected to the existing concrete and steel structure to direct the piping movement and distribute the load fr...
TA Series 7SM Control ValveSizes 1 1/4 – 2"/DN32 – DN50Maximum Working Pressure1 1/4 – 2"/DN32 – DN50: 363 psi/2503 kPa/25 bar2 1/2 – 3"/DN65 – DN8...
Despite challenges, Victaulic helped Green Mountain build the world's most secure data center inside a mountain with a strong & maintainable system.
Santa Barbara found challenges in bringing its Charles E. Meyer Desalination Plant back online after corrosive conditions & 2 decades in standby mode.
Unearthing our greatest resources in extremely challenging climates & operating conditions is made possible by modern practices.
The company’s research to determine how to retrofit a Boeing 747-400 to meet aerial firefighting requirements led company executives to Victaulic.
Victaulic products contribute to some of the world's tallest buildings, by bringing innovative solutions to high profile projects.