TOPIC: Insights

Circularity in Construction – Part 2: Preconstruction Strategies to Minimize Environmental Impact and Waste

Circularity in Construction – Part 2: Preconstruction Strategies to Minimize Environmental Impact and Waste

Selecting the right material and design considerations from the start can minimize impact and waste, even before setting foot on-site.

Circularity in Construction – Part 3: Reducing Impact and Waste on the Site

Circularity in Construction – Part 3: Reducing Impact and Waste on the Site

The method of construction can significantly impact a project’s ability to achieve its schedule goals, and it can impact safety and sustainability.

Circularity in Construction – Part 4: From an Operational Building to End-of-Life Scenarios

Circularity in Construction – Part 4: From an Operational Building to End-of-Life Scenarios

Shifting to a circular approach of “reduce-reuse-recycle” is essential to cut waste and to reduce waste going to landfills.

Fire Protection Solutions for The Future of Hospital Design

Fire Protection Solutions for The Future of Hospital Design

Heightened hospital fire safety requirements, growing healthcare demand, and advanced medical technology are driving hospital design trends in 2024.

Fire Safety Innovation in a Tightening-Built Environment

Fire Safety Innovation in a Tightening-Built Environment

Fire Safety innovation was forefront in a project for an electrical manufacturing facility utilizing world-class products from Victaulic.

A UK First for Sprinkler Installation

A UK First for Sprinkler Installation

A Victaulic state-of-the-art fire protection system in an e-commerce fulfillment centre, a UK first for sprinkler installation.

Keeping the ECMWF Data Centre Cooled & Weather Forecasts Running

Keeping the ECMWF Data Centre Cooled & Weather Forecasts Running

Learn more on how Victaulic pipe joining solutions helped in keeping the ECMWF data centre in Bologna, Italy cool.

Victaulic Helps Thermo Fisher Scale Operations for COVID-19 Sample Processing in Record Time

Victaulic Helps Thermo Fisher Scale Operations for COVID-19 Sample Processing in Record Time

Though no easy feat, Victaulic solutions helped Rand Construction expand Thermo Fisher's capacity for COVID-19 sample processing in 8 weeks.

Building the World’s Most Secure Data Center Inside a Mountain

Building the World’s Most Secure Data Center Inside a Mountain

Despite challenges, Victaulic helped Green Mountain build the world's most secure data center inside a mountain with a strong & maintainable system.