VICTAULIC BLOG

Keppel Marina East Desalination Plant

Keppel Marina East Desalination Plant

Singapore

Victaulic provided pipe joining solutions for Keppel Marina East Desalination Plant Project. 1st desalination plant to treat both freshwater & seaw...

5 Takeaways from the CII-CURT Joint Conference

5 Takeaways from the CII-CURT Joint Conference

Victaulic energy experts, Ravi Bhamidipati & Elliott Smith, highlight the 5 energy transition takeaways from the 2021 CII/CURT Joint Conference.

Downstream OGC Product Installation Instructions

Fabrication Solutions Installed at North Dakota Saltwater Disposal Facility

Fabrication Solutions Installed at North Dakota Saltwater Disposal Facility

North Dakota, USA

Victaulic's complete project partnership lead to bringing the facility online faster than anticipated, mitigated risk, and modularized construction.

Fabrication Solutions Installed at Permian Basin Production Facility

Fabrication Solutions Installed at Permian Basin Production Facility

Permian Basin, USA

Victaulic's vertically integrated fabrication solutions were utilized in many areas of the Permian Basin Production Facility fabricated piping proj...

Vent Line Installation at North Dakota Production Facility

Vent Line Installation at North Dakota Production Facility

North Dakota

A North Dakota production facility vent line installation project utilized Victaulic upstream solutions so it was completed on time & on budget.

Series 725T Diverter Valve Brochure

Victaulic Mining at Minexpo

Pressure Control Solutions for Potable Water