4901 Kesslersville Road Easton, PA 18040
Designed for use on metallic pipe which features ends formed with the Victaulic Original Groove System groove profile. Sizes from 2 – 8″ | DN50 – D...
Partnering with Victaulic enabled the Pilbara Minerals Pilgangoora Lithium-Tantalum Project to reduce risk, maximize productivity & enhance onsite ...
The Oaky Creek Coal Mine Raw Water Pipeline Project used Victaulic’s HDPE solution for it’s reliability, durability & flexibility in its components.
The Osisko Malartic Gold Mine Project used Victaulic large diameter pipe joining solutions due to their proven reliability, strength & ease of inst...
The Gold One Water Transport Project relied on Victaulic solutions that accommodate system deflection & provide ease of material handling.
Tunnel Under Vistula River Project, 1300 meter long tunnel which utilized Victaulic transportation infrastructure solutions for safer & faster comp...